Approval Documents

TitleDateLinkFile Size
Stage 1 Consolidated Project Approval5 November 20244 MB
TitleDateLinkFile Size
Assessment Report5 November 20242 MB
Instrument of Modification5 November 20242 MB
TitleDateLinkFile Size
TitleDateLinkFile Size
TitleDateLinkFile Size
TitleDateLinkFile Size
TitleDateLinkFile Size
TitleDateLinkFile Size
TitleDateLinkFile Size
TitleDateLinkFile Size
Environmental Assessment – Stage 1 Modification 825 October 20243 MB
Assessment Report – Stage 1 Modification 825 October 20243 MB
Notice of Modification – Stage 1 Modification 825 October 2024
TitleDateLinkFile Size
Response to Submissions – Stage 1 Modification 725 October 2024629 KB
Assessment Report – stage 1 Modification 725 October 20243 MB
Notice of Modification – Stage 1 Modification 725 October 202428 MB
TitleDateLinkFile Size
Environmental Assessment – Stage 1 Modification 625 October 20244 MB
Assessment Report – Stage 1 Modification 625 October 20243 MB
Notice of Modification – Stage 1 Modification 625 October 2024446 KB
TitleDateLinkFile Size
Environmental Assessment – Stage 1 Modification 525 October 20241 MB
Appendices 1 – 3 Stage 1 Modification 525 October 20242 MB
Appendix 4a – Stage 1 Modification 525 October 20248 MB
Appendix 4b – Stage 1 Modification 525 October 20242 MB
Plans – Stage 1 Modification 525 October 20243 MB
Response to Submissions Stage 1 Modification 525 October 2024151 KB
Assessment Report – Stage 1 Modification 525 October 20243 MB
Notice of Modification – Stage 1 Modification 525 October 20246 MB
TitleDateLinkFile Size
Environmental Assessment – Stage 1 Modification 424 October 20244 MB
Assessment Report -Stage 1 Modification 425 October 20243 MB
Notice of Modification – Stage 1 Modification 425 October 20244 MB
TitleDateLinkFile Size
Director General’s Requirements – Stage 1 Modification 324 October 20241,013 KB
TitleDateLinkFile Size
Environmental Assessment – Stage 1 Modification 224 October 20247 MB
Assessment Report – Stage 1 Modification 224 October 20243 MB
Notice of Modification – Stage 1 Modification 224 October 2024405 KB
TitleDateLinkFile Size
Notice of Modification24 October 2024980 KB
Modification Approval24 October 2024980 KB
TitleDateLinkFile Size
Environmental Assessment – Table of Contents and Executive Summary24 October 2024306 KB
Environmental Assessment – Section 1 – Introduction24 October 2024896 KB
Environmental Assessment – Section 2 – Project Approval Framework24 October 202499 KB
Environmental Assessment – Section 3 – Stakeholder and Community Consultation24 October 2024146 KB
Environmental Assessment – Section 4 – Project Description24 October 202410 MB
Environmental Assessment – Section 5 – Existing Environment and Interactions24 October 202432 MB
Environmental Assessment – Section 6 – Draft Statement of Commitments24 October 2024104 KB
Environmental Assessment – Section 7 – Project Justification and Conclusions0124 October 2024196 KB
Environmental Assessment – Section 8 – References24 October 202497 KB
Environmental Assessment – Section 9 – Abbreviations24 October 2024112 KB
EA – Plan 1 – Locality Plan24 October 2024422 KB
EA – Plan 2 – EL6288 & Development Application Area24 October 2024779 KB
EA – Plan 2a – Land Ownership24 October 202432 KB
EA – Plan 3 – General Arrangement24 October 20241 MB
EA – Plan 4 – Main Infrastructure Area24 October 2024701 KB
EA – Plan 5 – MCP at 6 months24 October 20242 MB
EA – Plan 6 – MCP at 2 years24 October 20242 MB
EA – Plan 7 – MCP at 5 years24 October 20242 MB
EA – Plan 8 – MCP at 8 years24 October 20242 MB
EA – Plan 9 – MCP at 10 years24 October 20242 MB
EA – Plan 10 – Open Cut 1 Access & Conveyor Arrangement24 October 2024421 KB
EA – Plan 11 – Underground No. 4 Longwall Layout & Staging24 October 20242 MB
EA – Plan 12 – Schematic of Proposed Water Management Strategy24 October 202454 KB
EA – Plan 12a – Surface Water Management in Main Infrastructure Area24 October 2024422 KB
EA – Plan 13 – Environmental Baseline Monitoring Location24 October 2024738 KB
EA – Plan 14 -Year 2 – Predicted Annual Average PM10 Dust Emissions24 October 2024716 KB
EA – Plan 15 – Year 5 – Predicted Annual Average PM10 Dust Emissions24 October 2024742 KB
EA – Plan 16 – Year 8 – Predicted Annual Average PM10 Dust Emissions24 October 2024784 KB
EA – Plan 18 – Year 1 – Predicted LAeq(15 minute) Noise Levels -ENE wind24 October 2024658 KB
EA – Plan 19 – Year 2 – Predicted LAeq(15 minute) Noise Levels -ENE wind24 October 2024688 KB
EA – Plan 20 – Year 6 – Predicted LAeq(15 minute) Noise Levels -ENE wind24 October 2024685 KB
EA – Plan 21 – Year 8 – Predicted LAeq(15 minute) Noise Levels – Start of Pit 3 (inversion)24 October 2024706 KB
EA – Plan 22 – Year 10 – Predicted LAeq(15 minute) Noise Levels – End of Pit 3 (inversion)24 October 2024715 KB
EA – Plan 23 – Regional Hydrological Units24 October 20243 MB
EA – Plan 24 – Existing Groundwater Levels Within Ulan Seam -Permian Coal Measures24 October 2024832 KB
EA – Plan 25 – Moolarben Groundwater Investigation Surficial Groundwater contours24 October 20243 MB
EA – Plan 26 – Predicted Drawdowns – Ulan Seam at Completion of Mining (2022-2023)24 October 20243 MB
EA – Plan 27 – Conceptual Stormwater Management at 6 months24 October 20242 MB
EA – Plan 28 – Conceptual Stormwater Management at 10 Years24 October 20245 MB
EA – Plan 29 – Surface Level Features Above Underground No. 424 October 20241 MB
EA – Plan 30 – Predicted Subsidence Levels for Underground No. 424 October 2024344 KB
EA – Plan 31 – Soil Type Boundaries24 October 20241,017 KB
EA – Plan 32 – Land Capability24 October 20241,018 KB
EA – Plan 33 – Agricultural Suitability24 October 20241,020 KB
EA – Plan 35 – Vegetation Associations24 October 20242 MB
EA – Plan 36 – Threatened Flora Species24 October 2024470 KB
EA – Plan 37 – Endangered Ecological Communities24 October 2024297 KB
EA – Plan 38 – Threatened Fauna Species24 October 2024516 KB
EA – Plan 39 – Preferred Final Land Use and Mitigation Strategy24 October 20243 MB
EA – Plan 40 – Aboriginal Heritage Locations24 October 2024757 KB
EA – Plan 41 – European Heritage Locations24 October 2024639 KB
EA – Plan 42 – Visual Impact from Ulan Village24 October 2024661 KB
Appendix 1 – Director General’s Requirements24 October 2024101 KB
Appendix 2 – Newsletters24 October 2024447 KB
Appendix 3 – Air Quality24 October 20242 MB
Appendix 3a – Health Risk Assessment24 October 2024303 KB
Appendix 4 – Noise and Blasting24 October 202412 MB
Appendix 4a – Amendment Figure 1724 October 202412 MB
Appendix 5 – Groundwater24 October 202437 MB
Appendix 7 – Flooding24 October 20248 MB
Appendix 8 – Subsidence24 October 202415 MB
Appendix 9 – Soils, Land Capability and Agricultural Suitability24 October 20248 MB
Appendix 10 – Geochemical24 October 2024334 KB
Appendix 11 – Flora, Fauna and Aquatic Ecology24 October 202416 MB
Appendix 12 – Aboriginal Heritage24 October 20247 MB
Appendix 13 – European Heritage24 October 20245 MB
Appendix 14 – Socio-Economic Analysis24 October 2024340 KB
Appendix 15 – Traffic24 October 20243 MB
Appendix 16 – Preliminary Hazard Analysis24 October 20241 MB
Appendix 17 – Visual Impact24 October 202417 MB
Response to Submissions24 October 2024443 KB
Response to Submissions Appendices 1 – 724 October 20244 MB
Response to Submissions Appendices 8 – 924 October 20246 MB
Response to Submissions Appendix 1024 October 20244 MB
Response to Submissions Appendix 1124 October 20243 MB
Response to Submissions Appendices 12 – 1724 October 20243 MB
IHAP Report24 October 2024747 KB
Addendum to IHAP Report24 October 202488 KB
Director General’s Report24 October 20242 MB
Response to Submissions24 October 20243 MB
Environmental Assessment24 October 20244 MB
Assessment Report24 October 202411 MB
Appendix 1 – Approval24 October 20243 MB
Appendix 2 – Air Quality25 October 2024472 KB
Appendix 3 – Acoustics25 October 202461 KB
Appendix 4 – Flora and Fauna Assessment25 October 20244 MB
Appendix 5 – Archaeology25 October 202411 MB
Appendix 6 – Visuals25 October 2024481 KB
Environmental Assessment – Part A25 October 2024950 KB
Environmental Assessment – Part B25 October 20249 MB
Environmental Assessment – Part C25 October 20241 MB
Environmental Assessment – Part C25 October 20241 MB
Plan 23 – Year 2 – Predicted Noise Contours LAeq(15 minute) – ENE Wind27 October 2024725 KB
PPR Appendix E – Groundwater Impact Assessment – Part B27 October 202414 MB
TitleDateLinkFile Size
Stage 2 Consolidated Project Approval5 November 20244 MB
TitleDateLinkFile Size
Assessment Report5 November 20242 MB
Instrument of Modification5 November 2024
TitleDateLinkFile Size
Response to Submission – Stage 2 Modification 429 October 202447 MB
Instrument of Modification – Stage 2 Modification 429 October 20241 MB
Assessment Report – Stage 2 Modification 429 October 20242 MB
Appendix E – Aboriginal Heritage Assessment – Stage 2 Modification 429 October 20242 MB
Appendix D – Biodiversity Assessment – Stage 2 Modification 429 October 202477 MB
Appendix C – Surface Water Assessment – Stage 2 Modification 429 October 20242 MB
Appendix B – Groundwater Review – Stage 2 Modification 429 October 202423 MB
Environmental Assessment – Stage 2 Modification 429 October 202430 MB
TitleDateLinkFile Size
Determination Report – Stage 2 Modification 329 October 2024784 KB
ASSESSMENT REPORT – Stage 2 Modification 329 October 202415 MB
Appendix I – Groundwater Assessment – Stage 2 Modification 329 October 20246 MB
Appendix H – Geochemistry Review – Stage 2 Modification 329 October 20242 MB
Appendix G – Aquatic Ecology Assessment – Stage 2 Modification 329 October 202417 MB
Appendix F – Controlled Water Release Impact Assessment – Stage 2 Modification 329 October 20242 MB
Appendix E – Site Water Balance and Surface Water Impact Assessment – Stage 2 Modification 329 October 20245 MB
Appendix D – Aboriginal Cultural Heritage Assessment – Stage 2 Modification 329 October 20249 MB
Appendix C – Biodiversity Assessment Review – Stage 2 Modification 329 October 20246 MB
Appendix B – Air Quality Assessment – Stage 2 Modification 329 October 20244 MB
Appendix A – Noise Assessment – Stage 2 Modification 329 October 20243 MB
Environmental Assessment – Stage 2 Modification 329 October 20249 MB
Executive Summary – Stage 2 Modification 329 October 20249 MB
Open Cut Optimisation Notice of Modification – Stage 2 Modification 329 October 20244 MB
Appendix A – Subsidence Assessment – Stage 2 Modification 329 October 20249 MB
TitleDateLinkFile Size
Notice of Modification – Stage 2 Modification 229 October 20242 MB
Planning & Assessment Commission Determination Report – Stage 2 Modification 229 October 2024211 KB
Assessment Report – Stage 2 Modification 229 October 20243 MB
Response to Submissions – Stage 2 Modification 229 October 20247 MB
Environmental Assessment – Appendix I – Community Infrastructure Assessment – Stage 2 Modification 229 October 20249 MB
Environmental Assessment – Appendix H – Road Transport Assessment – Stage 2 Modification 229 October 20245 MB
Environmental Assessment – Appendix G – Aboriginal Cultural Heritage Assessment – Stage 2 Modification 229 October 20244 MB
Environmental Assessment – Appendix F – Surface Water Assessment Review – Stage 2 Modification 229 October 20243 MB
Environmental Assessment – Appendix E – Flora and Fauna Assessment – Stage 2 Modification 229 October 20244 MB
Environmental Assessment – Appendix D – Air Quality Assessment – Stage 2 Modification 229 October 20249 MB
Environmental Assessment – Appendix C – Noise Assessment – Stage 2 Modification 229 October 20247 MB
Environmental Assessment – Appendix B – Groundwater Assessment – Stage 2 Modification 229 October 20249 MB
Environmental Assessment – Stage 2 Modification 229 October 20247 MB
TitleDateLinkFile Size
Notice of Modification – Stage 2 Modification 129 October 20244 MB
Assessment Report – Stage 2 Modification 129 October 202410 MB
Appendix E – Aboriginal Cultural Heritage Assessment – Stage 2 Modification 129 October 20244 MB
Appendix D – Surface Water Assessment – Stage 2 Modification 129 October 20241 MB
Appendix C – Flora And Fauna Assessment – Stage 2 Modification 129 October 20242 MB
Appendix B – Air Quality Assessment – Stage 2 Modification 129 October 20245 MB
Appendix A – Noise Assessment – Stage 2 Modification 129 October 20249 MB
Environmental Assessment – Stage 2 Modification 129 October 202416 MB
TitleDateLinkFile Size
Plan 1 – Regional Setting of the Moolarben Coal Project27 October 2024374 KB
Plan 2 – Local Setting of the Proposed Stage 2 Project and Property Ownership27 October 2024621 KB
Plan 02A – Land Ownership Details27 October 202419 KB
Plan 03 – Approved Stage 1 General Arrangement27 October 20241 MB
Plan 04 – Proposed Stage 2 General Arrangement27 October 20241 MB
Plan 05 – Proposed Open Cut 4 Mine Layout at Year 227 October 2024
Plan 06 – Proposed Open Cut 4 Mine Layout at Year 727 October 20241 MB
Plan 07 – Proposed Open Cut Mine Layout at Year 1227 October 20241 MB
Plan 08 – Proposed Open Cut 4 Mine Layout at Year 1627 October 20241 MB
Plan 09 – Proposed Open Cut Mine Layout at Year 1927 October 20241 MB
Plan 10 – Proposed Open Cut Mine Layout at Year 2427 October 20241 MB
Plan 11 – Underground No.1 and No.2 Mining Schedule27 October 20241 MB
Plan 13 – Elevations of the Stage 2 Infrastructure Area27 October 20242 MB
Plan 14 – Plan and Elevation of the Stage 2 Facilities27 October 20243 MB
Plan 15 – Water Management Strategy27 October 2024367 KB
Plan 16 – Environmental Monitoring and Weather Station Locations27 October 2024732 KB
Plan 17 – Year 2 – Predicted Annual Average PM10 Dust Emissions (cumulative)27 October 20242 MB
Plan 18 – Year 7 – Predicted Annual Average PM10 Dust Emissions (cumulative)27 October 20242 MB
Plan 19 – Year 12 – Predicted Annual Average PM10 Dust Emissions (cumulative)27 October 20242 MB
Plan 20 – Year 16 – Predicted Annual Average PM10 Dust Emissions (cumulative)27 October 20242 MB
Plan 21 – Year 19 – Predicted Annual Average PM10 Dust Emissions (cumulative)27 October 20242 MB
Plan 22 – Year 24 – Predicted Annual Average PM10 Dust Emissions (cumulative)27 October 2024618 KB
Plan 24 – Year 7 – Predicted Noise Contours LAeq(15 minute) – ENE Wind27 October 20242 MB
Plan 25 – Year 12 – Predicted Noise Contours LAeq(15 minute) – ENE Wind27 October 20242 MB
Plan 26 – Year 16 – Predicted Noise Contours LAeq(15 minute) – ENE Wind27 October 20242 MB
Plan 27 – Year 19 – Predicted Noise Contours LAeq(15 minute) – ENE Wind27 October 2024735 KB
Plan 28 – Year 24 – Predicted Noise Contours LAeq(15 minute) – ENE Wind27 October 2024695 KB
Plan 29 – Water Census Location27 October 20241 MB
Plan 30 – Hydrogeological Units and Piezometers27 October 2024
Plan 31 – Proposed Borefield Layout for Stages 1 and 227 October 2024137 KB
Plan 32 – Groundwater Conceptual Model and Boundary Conditions27 October 20242 MB
Plan 33 – Predicted Drawdowns in the Ulan Seam at Completion of Mining27 October 2024417 KB
Plan 34 – Catchment Surface Water Hydrology27 October 2024651 KB
Plan 35 – Surface Water Management of the Infrastructure Area27 October 20243 MB
Plan 36 – Surface Water Management for Years 1-227 October 20241 MB
Plan 37 – Surface Water Management for Year 1227 October 20241 MB
Plan 38 – Surface Water Management for Year 1927 October 20241 MB
Plan 39 – Surface Water Management for Year 2427 October 20241 MB
Plan 40 – Cross Sections of Post Mining Creek Alignments27 October 2024290 KB
Plan 41 – Cross Section of Typical Creek Riffle Structure27 October 2024274 KB
Plan 42 – Endangered Ecological Communities within Study Area27 October 20241 MB
Plan 43 – Broad Vegetation Communities27 October 20241 MB
Plan 44 – Threatened Flora Species of the Locality27 October 2024115 KB
Plan 45 – Threatened Fauna Species of the Locality27 October 2024130 KB
Plan 46 – Slopes and Cliff Lines Above Underground No.1 and Underground No.227 October 2024323 KB
Plan 47 – Heritage Sites and Survey Marks above Underground No.1 and Underground No.227 October 2024248 KB
Plan 48 – Predicted Subsidence Levels for Underground No.1 and Underground No.227 October 2024634 KB
Plan 49 – Aboriginal Heritage Locations27 October 20241 MB
Plan 50 – European Heritage Location27 October 2024505 KB
Plan 51 – Soil Type Boundaries27 October 2024965 KB
Plan 52 – Land Capability27 October 2024930 KB
Plan 53 – Agricultural Suitability27 October 2024969 KB
Plan 54 – Conceptual Post Mining Landscape27 October 2024591 KB
Plan 55 – Connectivity, Conservation and Dedication27 October 2024538 KB
Appendix 01A – Land Schedule27 October 20243 MB
Appendix 01B – Director General’s Requirements – Stage 227 October 20243 MB
Appendix 01C – Director General’s Requirements – 05 0117 MOD327 October 20246 MB
Appendix 02A – MCP Newsletters 1 to 627 October 20245 MB
Appendix 02B – Mine Dust Fact Sheet27 October 2024226 KB
Appendix 04 – Noise and Vibration Impact Assessment27 October 202422 MB
Appendix 03A – Air Quality Assessment 0927 October 20246 MB
Appendix 03B – Greenhouse Gas Report27 October 2024351 KB
Appendix 06B – Revised Water Balance27 October 2024
Appendix 07 – Ecological Impact Assessment27 October 202412 MB
Appendix 08 – Subsidence27 October 202413 MB
Appendix 09 – Aboriginal Cultural Heritage Assessment27 October 202437 MB
Appendix 10 – European Heritage27 October 20243 MB
Appendix 11 – Soils27 October 202412 MB
Appendix 12 – Road Traffic Report27 October 20241 MB
Appendix 13 – Rail Traffic Report27 October 20244 MB
Appendix 14 – Visuals Report27 October 20241 MB
Appendix 15 – Economics27 October 2024554 KB
Appendix 16 – Preliminary Hazard Analysis27 October 20242 MB
Appendix 17 – Geo-Chemical Assessment27 October 20243 MB
Preferred Project Report – Main Report – Part A27 October 202415 MB
Preferred Project Report – Main Report – Part B27 October 202413 MB
PPR Appendix A – Table of Submissions27 October 2024319 KB
PPR Appendix B – Stakeholder Consultation27 October 2024449 KB
PPR Appendix C – Air Quality Impact Assessment27 October 20245 MB
PPR Appendix D – Environmental Noise Assessment27 October 20242 MB
PPR Appendix E – Groundwater Impact Assessment – Part A27 October 202414 MB
PPR Appendix F – Supplementary Surface Water Strategy27 October 20241 MB
PPR Appendix G – Conceptual Design for Proposed Diversions of Murragamba & Eastern Creeks27 October 202413 MB
PPR Appendix H – Biodiversity Offsets Strategy27 October 20247 MB
PPR Appendix I – Subsidence Impact Assessment27 October 202410 MB
PPR Appendix J – Aboriginal Archaeology and Cultural Heritage Addendum27 October 20247 MB
Response to Submissions on Preferred Project Report – Part A27 October 20242 MB
Response to Submissions on Preferred Project Report – Part B27 October 20244 MB
Planning & Assessment Commission Review Report27 October 20243 MB
Response to PAC Review27 October 2024914 KB
Planning & Assessment Commission Determination Report27 October 2024177 KB
Plan 13 – Elevations of the Stage 2 Infrastructure Area28 October 2024831 KB
Environmental Assessment – Table of Contents29 October 20243 MB
Environmental Assessment – Executive Summary29 October 2024577 KB
Environmental Assessment – Abbreviations29 October 2024299 KB
Environmental Assessment – Glossary29 October 2024280 KB
Environmental Assessment – Section 1 – Introduction29 October 2024471 KB
Environmental Assessment – Section 2 – Project Approval Framework29 October 2024396 KB
Environmental Assessment – Section 3 – Stakeholder and Community Consultation29 October 2024299 KB
Environmental Assessment – Section 4 – Project Description29 October 20243 MB
Environmental Assessment – Section 5 – Impact Assessment29 October 20244 MB
Environmental Assessment – Section 6 – Statement of Commitments by MCM29 October 2024457 KB
Environmental Assessment – Section 7 – Project Justification29 October 2024455 KB
Environmental Assessment – Section 8 – References29 October 2024262 KB
Environmental Assessment – Appendix A – Subsidence Assessment29 October 20246 MB
2024 INDEPENDENT ENVIRONMENTAL AUDIT RESPONSE29 October 2024205 KB
INDEPENDENT ENVIRONMENTAL COMPLIANCE AUDIT, JULY 202429 October 20249 MB
2021 Independent Environmental Audit Response29 October 2024164 KB
TitleDateLinkFile Size
EPBC 2007/32974 October 20242 MB
EPBC 2008/44444 October 20242 MB
EPBC 2013/69264 October 20242 MB
EPBC 2017/79744 October 20241 MB
TitleDateLinkFile Size
Environment Protection Licence 129324 October 2024373 KB
TitleDateLinkFile Size
Mining Lease ML17154 October 20242 MB
Mining Lease ML16914 October 20241 MB
Mining Lease ML16284 October 20241 MB
Mining Lease ML16064 October 20241 MB
Mining Lease ML16054 October 20241 MB
Exploration Licence 62884 October 20241 MB
Exploration Licence 70744 October 2024947 KB
Exploration Licence 70734 October 2024856 KB

Environmental Management Plans, Strategies & Programs

TitleDateLinkFile Size
Air Quality Management Plan4 October 20242 MB
Biodiversity Management Plan4 October 20244 MB
Blast Management Plan4 October 20243 MB
Brine Management Plan4 October 20244 MB
Environmental Management Strategy4 October 202426 MB
EPBC 2008/4444 Biodiversity Offset Management Plan4 October 202410 MB
EPBC Biodiversity and Offset Management Plan4 October 202410 MB
Greenhouse Gas Minimisation Plan4 October 20242 MB
Heritage Management Plan4 October 20246 MB
Landscape Management Plan4 October 202414 MB
Noise Management Plan4 October 20242 MB
Pollution Incident Response Management Plan4 October 20244 MB
Rehabilitation Management Plan4 October 202411 MB
Water Management Plan4 October 20241 MB
Water Management Plan Appendix 1 – Site Water Balance4 October 202411 MB
Water Management Plan Appendix 2 – Surface Water Management Plan4 October 20247 MB
Water Management Plan Appendix 3 – Groundwater Management Plan4 October 20244 MB
TitleDateLinkFile Size
1. UG1 Longwalls 101 to 105 Extraction Plan – Main Text June 20207 October 202412 MB
2. Attachment 1 – Statutory Requirements7 October 2024353 KB
3. Attachment 2 – Relevant Consultation Records – UG17 October 2024244 KB
4. Attachment 3 – Program to Collect Baseline Data for Future Extraction – UG17 October 2024193 KB
5. Attachment 4 – Key Contact Register – UG17 October 2024200 KB
6. Technical Report 1 – Subsidence Report – UG17 October 202411 MB
7. Technical Report 2 – Groundwater Technical Report – UG17 October 20249 MB
8. Technical Report 3 – Surface Water Technical Report – UG17 October 20245 MB
9. Technical Report 4 – Biodiversity Technical Report – UG17 October 20242 MB
10. Technical Report 5 – Aboriginal Cultural Heritage Technical Report – UG17 October 20249 MB
11. Appendix A – Water Management Plan – UG17 October 202417 MB
12. Appendix B – Land Management Plan – UG17 October 20247 MB
13. Appendix C – Biodiversity Management Plan – UG17 October 20249 MB
14. Appendix D – Heritage Management Plan – UG17 October 20244 MB
15. Appendix E1 – BFMP – Australian Rail Track Corporation – UG17 October 20244 MB
16. Appendix E2 – BFMP – Mid-Western Regional Council – UG17 October 20244 MB
17. Appendix E3 – BFMP – TransGrid – UG17 October 20244 MB
18. Appendix E4 – BFMP – Essential Energy – UG17 October 20244 MB
19. Appendix E5 – BFMP – Telstra – UG17 October 20244 MB
20. Appendix F – Public Safety Management Plan – UG17 October 20245 MB
21. Appendix G – Subsidence Monitoring Program – UG17 October 202421 MB
TitleDateLinkFile Size
1. UG4 Longwalls 401 to 408 Extraction Plan – Main Text7 October 202412 MB
2. Attachment 1 – Statutory Requirements7 October 2024348 KB
3. Attachment 2 – Relevant Consultation Records7 October 2024206 KB
4. attachment 3 – Program to Collect Baseline Data for Future extraction Plans7 October 2024193 KB
5. Attachment 4 – Key Contact Register7 October 2024202 KB
6. Technical Report 1 – Subsidence Report7 October 20248 MB
7. Technical Report 2 – Groundwater Technical Report7 October 202442 MB
8. Technical Report 3 – Surface Water Technical Report7 October 20243 MB
9.Technical Report 4 – Biodiversity Technical Report7 October 20245 MB
10. Technical Report 5 – Aboriginal Cultural Heritage Technical Report7 October 202423 MB
11. Appendix A – Water Management Plan7 October 20245 MB
12. Appendix B – Land Management Plan7 October 20247 MB
13. APPENDIX C – BIODIVERSITY MANAGEMENT PLAN7 October 20248 MB
14. Appendix D – Heritage Management Plan7 October 20246 MB
15. Appendix E1 – BFMP – Australian Rail Track Corporation7 October 20246 MB
16. Appendix E2 – BFMP – Mid-Western Regional Council7 October 20246 MB
17. Appendix E3 – BFMP – UCMPL7 October 20247 MB
18. Appendix E4 – BFMP – Essential Energy7 October 20246 MB
19. Appendix E5 – BFMP – Telstra7 October 20246 MB
20. Appendix F – Public Safety Management Plan7 October 20246 MB
21. Appendix G – Subsidence Monitoring Program7 October 202483 MB
22. Approval letter_LW401-LW408 Final7 October 2024102 KB
23. Site S1MC280 Subsidence Monitoring and Mitigation Program7 October 20244 MB

Monitoring Documents

TitleDateLinkFile Size
Environmental Monitoring Report August 20241 August 20241 MB
Environmental Monitoring Report July 20241 July 20241 MB
Environmental Monitoring Report June 20241 June 20241 MB
Environmental Monitoring Report May 20241 May 20241 MB
Environmental Monitoring Report April 20241 April 20241 MB
Environmental Monitoring Report March 20241 March 20241 MB
Environmental Monitoring Report February 20241 February 20241 MB
Environmental Monitoring Report January 20244 January 20241 MB
Environmental Monitoring Report December 20231 December 20231 MB
Environmental Monitoring Report November 20231 November 20231 MB
Environmental Monitoring Report October 202323 October 20231 MB
Environmental Monitoring Report September 202323 September 20231 MB
Environmental Monitoring Report August 202323 August 20231 MB
Environmental Monitoring Report July 20231 July 20231 MB
TitleDateLinkFile Size
Community Complaints Register Summary 20244 October 202477 KB
Community Complaints Register Summary 202331 December 202377 KB
Community Complaints Register Summary 202231 December 202278 KB
Community Complaints Register Summary 202131 December 202177 KB
Community Complaints Register Summary 202031 December 202094 KB
Community Complaints Register Summary 201931 December 201995 KB
Community Complaints Register Summary 201831 December 201898 KB
Community Complaints Register Summary 201731 December 2017409 KB
Community Complaints Register Summary 201631 December 2016181 KB

Independent Studies and Audits

TitleDateLinkFile Size
2010 Independent Environmental Compliance Audit29 October 20245 MB
2012 Particulate Matter Control Best Practice Pollution Reduction Program29 October 20242 MB
2013 Independent Environmental Audit Response29 October 2024101 KB
2013 Independent Environmental Compliance Audit29 October 20244 MB
2015 Independent Environmental Audit Response29 October 2024289 KB
2015 Independent Environmental Compliance Audit29 October 20247 MB
2018 Independent Environmental Audit Response29 October 2024325 KB
2018 Independent Environmental Audit29 October 20249 MB
2018 Particulate Matter Control Best Practice Review29 October 2024752 KB
2021 Independent Environmental Audit29 October 202410 MB
2022 Independent Water Quality Study29 October 20246 MB
2024 Independent Environmental Audit Response29 October 2024205 KB
2024 Independent Environmental Compliance Audit29 October 20249 MB
TitleDateLinkFile Size
Annual Rehabilitation Report 202229 October 20242 MB
2023 Annual Review28 October 202417 MB
TitleDateLinkFile Size
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 6910 September 20245 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 6810 September 20244 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 6710 September 20246 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 6610 September 20247 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 6510 September 20246 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 6410 September 20248 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 6310 September 202414 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 6210 September 20249 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 6110 September 202411 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 6010 September 20248 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 5910 September 20244 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 5810 September 20244 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 5710 September 202414 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 5610 September 20245 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 5510 September 20245 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 5410 September 20245 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 5310 September 20243 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 5210 September 20244 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 5110 September 20244 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 5010 September 20244 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 4910 September 20246 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 4810 September 20244 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 4710 September 20243 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 4610 September 20243 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 4510 September 20246 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 4410 September 20244 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 4310 September 20246 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 4210 September 20244 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 4110 September 20247 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 4010 September 20245 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 3910 September 20244 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 3810 September 20248 MB
MOOLARBEN COAL OPERATIONS – COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 3710 September 20245 MB
MOOLARBEN COAL OPERATIONS ‐ COMMUNITY CONSULTATIVE COMMITTEE MEETING No. 3610 September 20244 MB
Back to Top