The Moolarben Coal Project Stage 1 of the Moolarben Coal Complex has commenced and at full development will comprise three open cut mines (OC1, OC2, and OC3), a longwall underground mine (UG4), and mining related infrastructure (including coal processing and transport facilities).

TitleLinkFile Size
Stage 1 Consolidated Project Approval4 MB

The Moolarben Coal Project Stage 1 was approved under Part 3A of the EP&A Act by the NSW Minister for Planning on 6 September 2007 (Project Approval [05_0117]).  Fourteen Modifications to Project Approval (05_0117) have since been approved. The modifications were generally required to reconfigure the mine layout (e.g. extension to mining areas, relocation of coal handling infrastructure and water infrastructure) and were aimed to improve the efficiency and operation of the Moolarben Coal Complex and enable access to additional economically viable coal reserves. Further information on these modifications can be found below.

TitleLinkFile Size
Environmental Assessment – Table of Contents and Executive Summary306 KB
Environmental Assessment – Section 1 – Introduction896 KB
Environmental Assessment – Section 2 – Project Approval Framework99 KB
Environmental Assessment – Section 3 – Stakeholder and Community Consultation146 KB
Environmental Assessment – Section 4 – Project Description10 MB
Environmental Assessment – Section 5 – Existing Environment and Interactions32 MB
Environmental Assessment – Section 6 – Draft Statement of Commitments104 KB
Environmental Assessment – Section 7 – Project Justification and Conclusions196 KB
Environmental Assessment – Section 8 – References97 KB
Environmental Assessment – Section 9 – Abbreviations112 KB
EA – Plan 1 – Locality Plan422 KB
EA – Plan 2 – EL6288 & Development Application Area779 KB
EA – Plan 2a – Land Ownership32 KB
EA – Plan 3 – General Arrangement1 MB
EA – Plan 4 – Main Infrastructure Area701 KB
EA – Plan 5 – MCP at 6 months2 MB
EA – Plan 6 – MCP at 2 years2 MB
EA – Plan 7 – MCP at 5 years2 MB
EA – Plan 8 – MCP at 8 years2 MB
EA – Plan 9 – MCP at 10 years2 MB
EA – Plan 10 – Open Cut 1 Access & Conveyor Arrangement421 KB
EA – Plan 11 – Underground No. 4 Longwall Layout & Staging2 MB
EA – Plan 12 – Schematic of Proposed Water Management Strategy54 KB
EA – Plan 12a – Surface Water Management in Main Infrastructure Area422 KB
EA – Plan 13 – Environmental Baseline Monitoring Location738 KB
EA – Plan 14 -Year 2 – Predicted Annual Average PM10 Dust Emissions716 KB
EA – Plan 15 – Year 5 – Predicted Annual Average PM10 Dust Emissions742 KB
EA – Plan 16 – Year 8 – Predicted Annual Average PM10 Dust Emissions784 KB
EA – Plan 17 – Year 10 Predicted Annual Average PM10 Dust Emissions784 KB
EA – Plan 18 – Year 1 – Predicted LAeq(15 minute) Noise Levels -ENE wind658 KB
EA – Plan 19 – Year 2 – Predicted LAeq(15 minute) Noise Levels -ENE wind688 KB
EA – Plan 20 – Year 6 – Predicted LAeq(15 minute) Noise Levels -ENE wind685 KB
EA – Plan 21 – Year 8 – Predicted LAeq(15 minute) Noise Levels – Start of Pit 3 (inversion)706 KB
EA – Plan 22 – Year 10 – Predicted LAeq(15 minute) Noise Levels – End of Pit 3 (inversion)715 KB
EA – Plan 23 – Regional Hydrological Units3 MB
EA – Plan 24 – Existing Groundwater Levels Within Ulan Seam -Permian Coal Measures832 KB
EA – Plan 25 – Moolarben Groundwater Investigation Surficial Groundwater contours3 MB
EA – Plan 26 – Predicted Drawdowns – Ulan Seam at Completion of Mining (2022-2023)3 MB
EA – Plan 27 – Conceptual Stormwater Management at 6 months2 MB
EA – Plan 28 – Conceptual Stormwater Management at 10 Years5 MB
EA – Plan 29 – Surface Level Features Above Underground No. 41 MB
EA – Plan 30 – Predicted Subsidence Levels for Underground No. 4344 KB
EA – Plan 31 – Soil Type Boundaries1,017 KB
EA – Plan 32 – Land Capability1,018 KB
EA – Plan 33 – Agricultural Suitability1,020 KB
EA – Plan 35 – Vegetation Associations2 MB
EA – Plan 36 – Threatened Flora Species470 KB
EA – Plan 37 – Endangered Ecological Communities297 KB
EA – Plan 38 – Threatened Fauna Species516 KB
EA – Plan 39 – Preferred Final Land Use and Mitigation Strategy3 MB
EA – Plan 40 – Aboriginal Heritage Locations757 KB
EA – Plan 41 – European Heritage Locations639 KB
EA – Plan 42 – Visual Impact from Ulan Village661 KB
Appendix 1 – Director General’s Requirements101 KB
Appendix 2 – Newsletters447 KB
Appendix 3 – Air Quality2 MB
Appendix 3a – Health Risk Assessment303 KB
Appendix 4 – Noise and Blasting12 MB
Appendix 4a – Amendment Figure 1712 MB
Appendix 5 – Groundwater37 MB
Appendix 7 – Flooding8 MB
Appendix 8 – Subsidence15 MB
Appendix 9 – Soils, Land Capability and Agricultural Suitability8 MB
Appendix 10 – Geochemical334 KB
Appendix 11 – Flora, Fauna and Aquatic Ecology16 MB
Appendix 12 – Aboriginal Heritage7 MB
Appendix 13 – European Heritage5 MB
Appendix 14 – Socio-Economic Analysis340 KB
Appendix 15 – Traffic3 MB
Appendix 16 – Preliminary Hazard Analysis1 MB
Appendix 17 – Visual Impact17 MB
Response to Submissions3 MB
Response to Submissions Appendices 1 – 74 MB
Response to Submissions Appendices 8 – 96 MB
Response to Submissions Appendix 104 MB
Response to Submissions Appendix 113 MB
Response to Submissions Appendices 12 – 173 MB
IHAP Report747 KB
Addendum to IHAP Report88 KB
Director General’s Report2 MB
TitleLinkFile Size
Environmental Assessment4 MB
Modification Approval.980 KB
Response to Submissions443 KB
Assessment Report11 MB
Notice of Modification980 KB
TitleLinkFile Size
Environmental Assessment7 MB
Assessment Report3 MB
Notice of Modification405 KB
TitleLinkFile Size
Director General’s Requirements – Stage 1 Modification 31,013 KB
TitleLinkFile Size
Environmental Assessment4 MB
Appendix 1 – Approval3 MB
Appendix 2 – Air Quality472 KB
Appendix 3 – Acoustics61 KB
Appendix 4 – Flora and Fauna Assessment4 MB
Appendix 5 – Archaeology11 MB
Appendix 6 – Visuals481 KB
Assessment Report3 MB
Notice of Modification4 MB
TitleLinkFile Size
Environmental Assessment1 MB
Appendices 1 – 3 Stage 1 Modification 52 MB
Appendix 4a – Stage 1 Modification 58 MB
Appendix 4b – Stage 1 Modification 52 MB
Plans Stage 1 Modification 53 MB
Response to Submissions151 KB
Assessment Report3 MB
Notice of Modification6 MB
TitleLinkFile Size
Environmental Assessment4 MB
Assessment Report3 MB
Notice of Modification446 KB
TitleLinkFile Size
Environmental Assessment – Part A950 KB
Environmental Assessment – Part B9 MB
Environmental Assessment – Part C1 MB
Response to Submissions629 KB
Assessment Report3 MB
Notice of Modification28 MB
TitleLinkFile Size
Environmental Assessment3 MB
Assessment Report3 MB
Notice of Modification
TitleLinkFile Size
Environmental Assessment – Vol 1 – Main Report5 MB
Environmental Assessment – Vol 2 – Appendices A-C Noise & Vibration Impact Assessment4 MB
Environmental Assessment – Vol 2 – Appendix D Air Quality and Greenhouse Gas Assessment7 MB
Environmental Assessment – Vol 2 – Appendix E Ecological Impact Assessment6 MB
Environmental Assessment – Vol 3 – Appendix F-G Part 1 of 3 Aboriginal Heritage Impact Assessment4 MB
Environmental Assessment – Vol 3 – Appendix F-G Part 2 of 3 Previously Recorded Aboriginal Site Records7 MB
Environmental Assessment – Vol 3 – Appendix F-G Part 3 of 3 Historic Heritage Impact Assessment688 KB
Environmental Assessment – Vol 4 – Appendices H-I Visual Impact Assessment, Surface Water Impact Assessment6 MB
Environmental Assessment – Vol 4 – Appendices J-L Groundwater Impact Assessment, Soils and Agricultural Impact Assessment, Economic Impact Assessment7 MB
Response to Submissions9 MB
Director General’s Report26 MB
Planning and Assessment Commission Report74 KB
Notice of Modification2 MB
TitleLinkFile Size
Environmental Assessment1 MB
Assessment Report2 MB
Notice of Modification70 KB
TitleLinkFile Size
Environmental Assessment16 MB
Appendix A – Noise Assessment9 MB
Appendix B – Air Quality Assessment5 MB
Appendix C – Fora and Fauna Assessment2 MB
Appendix D – Surface Water Assessment Review1 MB
Appendix E – Aboriginal Cultural Heritage Assessment4 MB
Response to Submissions492 KB
Assessment Report10 MB
Notice of Modification2 MB
TitleLinkFile Size
Assessment Report2 MB
Environmental Assessment7 MB
Appendix A – Subsidence Assessment6 MB
Appendix A – Subsidence Assessment Part B6 MB
Appendix A – Groundwater Assessment9 MB
Appendix C – Noise Assessment7 MB
Appendix D – Air Quality Assessment9 MB
Appendix E – Flora and Fauna Impact Assessment4 MB
Appendix F – Surface Water Assessment Review3 MB
Appendix H – Road Transport Assessment5 MB
Appendix I – Community Infrastructure Assessment9 MB
Response to Submissions7 MB
Notice of Modification2 MB
TitleLinkFile Size
Temporary Coal Washing Limit Increase Modification943 KB
Assessment Report114 KB
Notice of Determination87 KB
Notice of Modification48 KB
TitleLinkFile Size
Executive Summary9 MB
Environmental Assessment9 MB
Attachment 1 ‐ Secretary’s Environmental Assessment Requirements250 KB
Attachment 2 ‐ Stage 1 Project Approval4 MB
Attachment 3 ‐ Stage 2 Project Approval3 MB
Appendix A ‐ Noise Assessment3 MB
Appendix B ‐ Air Quality Assessment4 MB
Appendix C ‐ Biodiversity Assessment6 MB
Appendix D ‐ Aboriginal Cultural Heritage Assessment9 MB
Appendix E ‐ Site Water Balance and Surface Water Impact Assessment5 MB
Appendix F ‐ Controlled Water Release Impact Assessment2 MB
Appendix G ‐ Aquatic Ecology Assessment17 MB
Appendix H ‐ Geochemistry Review2 MB
Appendix I ‐ Groundwater Assessment6 MB
Response to Submissions4 MB
Open Cut Optimisation Modification Approval2 MB
Assessment Report15 MB
Determination Report784 KB
TitleLinkFile Size
Modification Report13 MB
Appendix A – Aboriginal Cultural Heritage Assessment6 MB
Appendix B – Biodiversity Development Assessment Report14 MB
Appendix C – Flooding Review16 MB
Appendix D – Surface Water Review6 MB
Appendix E – Noise Review6 MB
Appendix F – Air Quality Review.7 MB
Appendix G – Road Transport Review3 MB
Appendix H – Groundwater Review6 MB
Notice of Modification1 MB
TitleLinkFile Size
Assessment Report2 MB
Instrument of Modification2 MB
TitleLinkFile Size
Stage 2 Consolidated Project Approval4 MB
TitleLinkFile Size
Environmental Assessment – Table of Contents3 MB
Environmental Assessment – Executive Summary577 KB
Environmental Assessment – Abbreviations299 KB
Environmental Assessment – Glossary280 KB
Environmental Assessment – Section 1 – Introduction471 KB
Environmental Assessment – Section 2 – Project Approval Framework396 KB
Environmental Assessment – Section 3 – Stakeholder and Community Consultation299 KB
Environmental Assessment – Section 4 – Project Description3 MB
Environmental Assessment – Section 5 – Impact Assessment4 MB
Environmental Assessment – Section 6 – Statement of Commitments by MCM457 KB
Environmental Assessment – Section 7 – Project Justification455 KB
Environmental Assessment – Section 8 – References262 KB
Plan 1 – Regional Setting of the Moolarben Coal Project374 KB
Plan 2 – Local Setting of the Proposed Stage 2 Project and Property Ownership621 KB
Plan 02A – Land Ownership Details19 KB
Plan 03 – Approved Stage 1 General Arrangement1 MB
Plan 04 – Proposed Stage 2 General Arrangement1 MB
Plan 05 – Proposed Open Cut 4 Mine Layout at Year 2
Plan 06 – Proposed Open Cut 4 Mine Layout at Year 71 MB
Plan 07 – Proposed Open Cut Mine Layout at Year 121 MB
Plan 08 – Proposed Open Cut 4 Mine Layout at Year 161 MB
Plan 09 – Proposed Open Cut Mine Layout at Year 191 MB
Plan 10 – Proposed Open Cut Mine Layout at Year 241 MB
Plan 11 – Underground No.1 and No.2 Mining Schedule1 MB
Plan 13 – Elevations of the Stage 2 Infrastructure Area2 MB
Plan 14 – Plan and Elevation of the Stage 2 Facilities3 MB
Plan 15 – Water Management Strategy367 KB
Plan 16 – Environmental Monitoring and Weather Station Locations732 KB
Plan 17 – Year 2 – Predicted Annual Average PM10 Dust Emissions (cumulative)2 MB
Plan 18 – Year 7 – Predicted Annual Average PM10 Dust Emissions (cumulative)2 MB
Plan 19 – Year 12 – Predicted Annual Average PM10 Dust Emissions (cumulative)2 MB
Plan 20 – Year 16 – Predicted Annual Average PM10 Dust Emissions (cumulative)2 MB
Plan 21 – Year 19 – Predicted Annual Average PM10 Dust Emissions (cumulative)2 MB
Plan 22 – Year 24 – Predicted Annual Average PM10 Dust Emissions (cumulative)618 KB
Plan 23 – Year 2 – Predicted Noise Contours LAeq(15 minute) – ENE Wind725 KB
Plan 24 – Year 7 – Predicted Noise Contours LAeq(15 minute) – ENE Wind2 MB
Plan 25 – Year 12 – Predicted Noise Contours LAeq(15 minute) – ENE Wind2 MB
Plan 26 – Year 16 – Predicted Noise Contours LAeq(15 minute) – ENE Wind2 MB
Plan 27 – Year 19 – Predicted Noise Contours LAeq(15 minute) – ENE Wind735 KB
Plan 28 – Year 24 – Predicted Noise Contours LAeq(15 minute) – ENE Wind695 KB
Plan 29 – Water Census Location1 MB
Plan 30 – Hydrogeological Units and Piezometers
Plan 31 – Proposed Borefield Layout for Stages 1 and 2137 KB
Plan 32 – Groundwater Conceptual Model and Boundary Conditions2 MB
Plan 33 – Predicted Drawdowns in the Ulan Seam at Completion of Mining417 KB
Plan 34 – Catchment Surface Water Hydrology651 KB
Plan 35 – Surface Water Management of the Infrastructure Area3 MB
Plan 36 – Surface Water Management for Years 1-21 MB
Plan 37 – Surface Water Management for Year 121 MB
Plan 38 – Surface Water Management for Year 191 MB
Plan 39 – Surface Water Management for Year 241 MB
Plan 40 – Cross Sections of Post Mining Creek Alignments290 KB
Plan 41 – Cross Section of Typical Creek Riffle Structure274 KB
Plan 42 – Endangered Ecological Communities within Study Area1 MB
Plan 43 – Broad Vegetation Communities1 MB
Plan 44 – Threatened Flora Species of the Locality115 KB
Plan 45 – Threatened Fauna Species of the Locality130 KB
Plan 46 – Slopes and Cliff Lines Above Underground No.1 and Underground No.2323 KB
Plan 47 – Heritage Sites and Survey Marks above Underground No.1 and Underground No.2248 KB
Plan 48 – Predicted Subsidence Levels for Underground No.1 and Underground No.2634 KB
Plan 49 – Aboriginal Heritage Locations1 MB
Plan 50 – European Heritage Location505 KB
Plan 51 – Soil Type Boundaries965 KB
Plan 52 – Land Capability930 KB
Plan 53 – Agricultural Suitability969 KB
Plan 54 – Conceptual Post Mining Landscape591 KB
Plan 55 – Connectivity, Conservation and Dedication538 KB
Appendix 01A – Land Schedule3 MB
Appendix 01B – Director General’s Requirements – Stage 23 MB
Appendix 01C – Director General’s Requirements – 05 0117 MOD36 MB
Appendix 02A – MCP Newsletters 1 to 65 MB
Appendix 02B – Mine Dust Fact Sheet226 KB
Appendix 04 – Noise and Vibration Impact Assessment22 MB
Appendix 03A – Air Quality Assessment 096 MB
Appendix 03B – Greenhouse Gas Report351 KB
Appendix 06B – Revised Water Balance
Appendix 07 – Ecological Impact Assessment12 MB
Appendix 08 – Subsidence13 MB
Appendix 09 – Aboriginal Cultural Heritage Assessment37 MB
Appendix 10 – European Heritage3 MB
Appendix 11 – Soils12 MB
Appendix 12 – Road Traffic Report1 MB
Appendix 13 – Rail Traffic Report4 MB
Appendix 14 – Visuals Report1 MB
Appendix 15 – Economics554 KB
Appendix 16 – Preliminary Hazard Analysis2 MB
Appendix 17 – Geo-Chemical Assessment3 MB
Preferred Project Report – Main Report – Part A15 MB
Preferred Project Report – Main Report – Part B13 MB
PPR Appendix A – Table of Submissions319 KB
PPR Appendix B – Stakeholder Consultation449 KB
PPR Appendix C – Air Quality Impact Assessment5 MB
PPR Appendix D – Environmental Noise Assessment2 MB
PPR Appendix E – Groundwater Impact Assessment – Part A14 MB
PPR Appendix E – Groundwater Impact Assessment – Part B14 MB
PPR Appendix F – Supplementary Surface Water Strategy1 MB
PPR Appendix G – Conceptual Design for Proposed Diversions of Murragamba & Eastern Creeks13 MB
PPR Appendix H – Biodiversity Offsets Strategy7 MB
PPR Appendix I – Subsidence Impact Assessment10 MB
PPR Appendix J – Aboriginal Archaeology and Cultural Heritage Addendum7 MB
Response to Submissions on Preferred Project Report – Part A2 MB
Response to Submissions on Preferred Project Report – Part B4 MB
Planning & Assessment Commission Review Report3 MB
Response to PAC Review914 KB
Planning & Assessment Commission Determination Report177 KB
TitleLinkFile Size
Environmental Assessment16 MB
Appendix A – Noise Assessment9 MB
Appendix B – Air Quality Assessment5 MB
Appendix C – Flora And Fauna Assessment – Stage 2 Modification 12 MB
Appendix D – Surface Water Assessment1 MB
Appendix E – Aboriginal Cultural Heritage Assessment4 MB
Assessment Report10 MB
Notice of Modification4 MB
TitleLinkFile Size
Environmental Assessment7 MB
Environmental Assessment – Appendix A – Subsidence Assessment6 MB
Environmental Assessment – Appendix B – Groundwater Assessment9 MB
Environmental Assessment – Appendix C – Noise Assessment7 MB
Environmental Assessment – Appendix D – Air Quality Assessment9 MB
Environmental Assessment – Appendix E – Flora and Fauna Assessment4 MB
Environmental Assessment – Appendix F – Surface Water Assessment Review3 MB
Environmental Assessment – Appendix G – Aboriginal Cultural Heritage Assessment4 MB
Environmental Assessment – Appendix H – Road Transport Assessment5 MB
Environmental Assessment – Appendix I – Community Infrastructure Assessment9 MB
Response to Submissions7 MB
Assessment Report3 MB
Planning & Assessment Commission Determination Report211 KB
Notice of Modification2 MB
TitleLinkFile Size
Open Cut Optimisation Notice of Modification4 MB
Executive Summary9 MB
Environmental Assessment9 MB
Appendix A – Noise Assessment3 MB
Appendix B – Air Quality Assessment4 MB
Appendix C – Biodiversity Assessment Review6 MB
Appendix D – Aboriginal Cultural Heritage Assessment9 MB
Appendix E – Site Water Balance and Surface Water Impact Assessment5 MB
Appendix F – Controlled Water Release Impact Assessment2 MB
Appendix G – Aquatic Ecology Assessment17 MB
Appendix H – Geochemistry Review2 MB
Appendix I – Groundwater Assessment6 MB
Assessment Report15 MB
Determination Report784 KB
TitleLinkFile Size
Environmental Assessment30 MB
Appendix A – Subsidence Assessment9 MB
Appendix B – Groundwater Review23 MB
Appendix C – Surface Water Assessment2 MB
Appendix D – Biodiversity Assessment77 MB
Appendix E – Aboriginal Heritage Assessment2 MB
Assessment Report2 MB
Instrument of Modification1 MB
Response to Submission47 MB
TitleLinkFile Size
Assessment Report2 MB
Instrument of Modification
TitleLinkFile Size
Environment Protection Licence 12932373 KB
TitleLinkFile Size
EPBC 2007/32972 MB
EPBC 2008/44442 MB
EPBC 2013/69262 MB
EPBC 2017/79741 MB
TitleLinkFile Size
Mining Lease ML16051 MB
Mining Lease ML16061 MB
Mining Lease ML16281 MB
Mining Lease ML16911 MB
Mining Lease ML17152 MB
Exploration Licence 7073856 KB
Exploration Licence 7074947 KB
Exploration Licence 62881 MB
TitleLinkFile Size
Moolarben Coal Forward Program256 KB
Plan 2A Forecast Data – year 15 MB
Plan 2B Forecast Data – year 25 MB
Plan 2C Forecast Data – year 35 MB

Environmental Management Plans, Strategies & Programs

TitleLinkFile Size
Air Quality Management Plan2 MB
Biodiversity Management Plan4 MB
Blast Management Plan3 MB
Brine Management Plan4 MB
Environmental Management Strategy26 MB
EPBC 2008/4444 Biodiversity Offset Management Plan10 MB
EPBC Biodiversity and Offset Management Plan10 MB
Greenhouse Gas Minimisation Plan2 MB
Heritage Management Plan6 MB
Landscape Management Plan14 MB
Noise Management Plan2 MB
Pollution Incident Response Management Plan1 MB
Rehabilitation Management Plan11 MB
Water Management Plan1 MB
Water Management Plan Appendix 1 – Site Water Balance11 MB
Water Management Plan Appendix 2 – Surface Water Management Plan7 MB
Water Management Plan Appendix 3 – Groundwater Management Plan4 MB
TitleLinkFile Size
1. UG1 Longwalls 101 to 105 Extraction Plan – Main Text June 202012 MB
2. Attachment 1 – Statutory Requirements353 KB
3. Attachment 2 – Relevant Consultation Records – UG1244 KB
4. Attachment 3 – Program to Collect Baseline Data for Future Extraction – UG1193 KB
5. Attachment 4 – Key Contact Register – UG1200 KB
6. Technical Report 1 – Subsidence Report – UG111 MB
7. Technical Report 2 – Groundwater Technical Report – UG19 MB
8. Technical Report 3 – Surface Water Technical Report – UG15 MB
9. Technical Report 4 – Biodiversity Technical Report – UG12 MB
10. Technical Report 5 – Aboriginal Cultural Heritage Technical Report – UG19 MB
11. Appendix A – Water Management Plan – UG117 MB
12. Appendix B – Land Management Plan – UG17 MB
13. Appendix C – Biodiversity Management Plan – UG19 MB
14. Appendix D – Heritage Management Plan – UG14 MB
15. Appendix E1 – BFMP – Australian Rail Track Corporation – UG14 MB
16. Appendix E2 – BFMP – Mid-Western Regional Council – UG14 MB
17. Appendix E3 – BFMP – TransGrid – UG14 MB
18. Appendix E4 – BFMP – Essential Energy – UG14 MB
19. Appendix E5 – BFMP – Telstra – UG14 MB
20. Appendix F – Public Safety Management Plan – UG15 MB
21. Appendix G – Subsidence Monitoring Program – UG121 MB
TitleLinkFile Size
1. UG4 Longwalls 401 to 408 Extraction Plan – Main Text12 MB
2. Attachment 1 – Statutory Requirements348 KB
3. Attachment 2 – Relevant Consultation Records206 KB
4. attachment 3 – Program to Collect Baseline Data for Future extraction Plans193 KB
5. Attachment 4 – Key Contact Register202 KB
6. Technical Report 1 – Subsidence Report8 MB
7. Technical Report 2 – Groundwater Technical Report42 MB
8. Technical Report 3 – Surface Water Technical Report3 MB
9.Technical Report 4 – Biodiversity Technical Report5 MB
10. Technical Report 5 – Aboriginal Cultural Heritage Technical Report23 MB
11. Appendix A – Water Management Plan5 MB
12. Appendix B – Land Management Plan7 MB
13. APPENDIX C – BIODIVERSITY MANAGEMENT PLAN8 MB
14. Appendix D – Heritage Management Plan6 MB
15. Appendix E1 – BFMP – Australian Rail Track Corporation6 MB
16. Appendix E2 – BFMP – Mid-Western Regional Council6 MB
17. Appendix E3 – BFMP – UCMPL7 MB
18. Appendix E4 – BFMP – Essential Energy6 MB
19. Appendix E5 – BFMP – Telstra6 MB
20. Appendix F – Public Safety Management Plan6 MB
21. Appendix G – Subsidence Monitoring Program83 MB
22. Approval letter_LW401-LW408 Final102 KB
23. Site S1MC280 Subsidence Monitoring and Mitigation Program4 MB

Monitoring Documents

TitleLinkFile Size
Environmental Monitoring Report November 20241 MB
Environmental Monitoring Report October 20241 MB
Environmental Monitoring Report September 20241 MB
Environmental Monitoring Report August 20241 MB
Environmental Monitoring Report July 20241 MB
Environmental Monitoring Report June 20241 MB
Environmental Monitoring Report May 20241 MB
Environmental Monitoring Report April 20241 MB
Environmental Monitoring Report March 20241 MB
Environmental Monitoring Report February 20241 MB
Environmental Monitoring Report January 20241 MB
Environmental Monitoring Report December 20231 MB
TitleLinkFile Size
Community Complaints Register Summary 202477 KB
Community Complaints Register Summary 202377 KB
Community Complaints Register Summary 202278 KB
Community Complaints Register Summary 202177 KB
Community Complaints Register Summary 202094 KB
Community Complaints Register Summary 201995 KB
Community Complaints Register Summary 201898 KB
Community Complaints Register Summary 2017409 KB
Community Complaints Register Summary 2016181 KB

Environmental Reports Studies and Audits

TitleLinkFile Size
2024 Independent Environmental Compliance Audit9 MB
2024 Independent Environmental Audit Response205 KB
2022 Independent Water Quality Study6 MB
2021 Independent Environmental Audit10 MB
2021 Independent Environmental Audit Response164 KB
2018 Particulate Matter Control Best Practice Review752 KB
2018 Independent Environmental Audit9 MB
2018 Independent Environmental Audit Response325 KB
2015 Independent Environmental Compliance Audit7 MB
2015 Independent Environmental Audit Response289 KB
2013 Independent Environmental Compliance Audit4 MB
2013 Independent Environmental Audit Response101 KB
2012 Particulate Matter Control Best Practice Pollution Reduction Program2 MB
2010 Independent Environmental Compliance Audit5 MB
TitleLinkFile Size
2023 Annual Review17 MB
2022 Annual Review16 MB
2022 Moolarben Coal Project EPBC Compliance Report572 KB
2021 Annual Review13 MB
2021 Moolarben Coal Project EPBC Compliance Report7 MB
2020 Annual Review18 MB
2020 Moolarben Coal Project EPBC Compliance Report7 MB
2019 Annual Review12 MB
2019 Moolarben Coal Project EPBC Compliance Report3 MB
2018 Annual Review3 MB
2018 Annual Review Appendices11 MB
2018 Moolarben Coal Project EPBC Compliance Report577 KB
2017 Annual Review3 MB
2017 Annual Review Appendices8 MB
2016 Annual Review – Part 14 MB
2016 Annual Review – Part 28 MB
2016 Annual Review Appendix9 MB
2015 Annual Review5 MB
2013 – 2014 Annual Environmental Management Report14 MB
2012 – 2013 Annual Environmental Management Report24 MB
2011 – 2012 Annual Environmental Management Report21 MB
TitleLinkFile Size
Annual Rehabilitation Report 2023300 KB
Annual Rehabilitation Report 20222 MB

Community

TitleLinkFile Size
Moolarben Coal Operations – Community Consultative Committee Meeting No. 715 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 705 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 695 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 684 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 676 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 667 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 656 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 648 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 6314 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 629 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 6111 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 608 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 594 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 584 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 5714 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 565 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 555 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 545 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 533 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 524 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 514 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 504 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 496 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 484 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 473 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 463 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 456 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 444 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 436 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 424 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 417 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 405 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 394 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 388 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 375 MB
Moolarben Coal Operations – Community Consultative Committee Meeting No. 364 MB
Back to Top